  "meta": {
    "id": "lien-deadlines",
    "title": "Mechanics lien deadlines by state (2026)",
    "license": "CC BY 4.0",
    "retrievedAt": "2026-09-30",
    "verifiedAt": "2026-10-01",
    "reviewBy": "2026-12-31",
    "sources": [
      {
        "id": "az-0",
        "title": "A.R.S. § 33-992.01, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00992-01.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-1",
        "title": "Laws 2024, ch. 89 (H.B. 2110), Arizona Legislature",
        "url": "https://www.azleg.gov/legtext/56leg/2R/laws/0089.htm",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "az-2",
        "title": "A.R.S. § 33-993, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00993.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-3",
        "title": "A.R.S. § 33-998, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00998.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-4",
        "title": "A.R.S. § 33-1002, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/01002.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-5",
        "title": "A.R.S. § 1-243, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00243.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-6",
        "title": "A.R.S. § 1-303, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00303.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-7",
        "title": "A.R.S. § 1-301, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00301.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-0",
        "title": "Cal. Civ. Code § 8204, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-1",
        "title": "Cal. Civ. Code § 8200, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-2",
        "title": "Cal. Civ. Code § 8110, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8110",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-3",
        "title": "Cal. Civ. Code § 8412, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-4",
        "title": "Cal. Civ. Code § 8190, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-5",
        "title": "Cal. Civ. Code § 8414, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8414",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-6",
        "title": "Cal. Civ. Code § 8460, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8460",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-7",
        "title": "Cal. Civ. Code § 8180, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8180",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-8",
        "title": "Cal. Civ. Code § 8182, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8182",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-9",
        "title": "Cal. Code Civ. Proc. § 12, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-10",
        "title": "Cal. Civ. Code § 8058, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8058",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-11",
        "title": "Cal. Code Civ. Proc. § 12a, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-12",
        "title": "Cal. Code Civ. Proc. § 135, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-13",
        "title": "Cal. Code Civ. Proc. § 12b, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12b",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "fl-0",
        "title": "Fla. Stat. ch. 713 (2025), Online Sunshine",
        "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
        "retrievedAt": "2026-05-17",
        "type": "statute"
      },
      {
        "id": "fl-1",
        "title": "Fla. Stat. § 110.117 (2025), Online Sunshine",
        "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
        "retrievedAt": "2025-11-18",
        "type": "statute"
      },
      {
        "id": "ga-0",
        "title": "Official Code of Georgia Annotated, LexisNexis public access for the Georgia General Assembly",
        "url": "https://www.lexisnexis.com/hottopics/gacode/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "il-0",
        "title": "770 ILCS 60, Mechanics Lien Act, Illinois General Assembly",
        "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "il-1",
        "title": "770 ILCS 60, Mechanics Lien Act, Illinois General Assembly",
        "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
        "retrievedAt": "2026-04-09",
        "type": "statute"
      },
      {
        "id": "il-2",
        "title": "5 ILCS 70/1.11, Illinois General Assembly",
        "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
        "retrievedAt": "2025-05-02",
        "type": "statute"
      },
      {
        "id": "il-3",
        "title": "205 ILCS 630/17, Illinois General Assembly",
        "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
        "retrievedAt": "2025-03-11",
        "type": "statute"
      },
      {
        "id": "nc-0",
        "title": "N.C. Gen. Stat. ch. 44A, art. 2, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
        "retrievedAt": "2026-05-17",
        "type": "statute"
      },
      {
        "id": "nc-1",
        "title": "N.C. Gen. Stat. § 1-593, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260311222231id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1/GS_1-593.html",
        "retrievedAt": "2026-03-11",
        "type": "statute"
      },
      {
        "id": "nc-2",
        "title": "N.C. Gen. Stat. § 1A-1, Rule 6, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
        "retrievedAt": "2026-06-14",
        "type": "statute"
      },
      {
        "id": "nc-3",
        "title": "N.C. Gen. Stat. § 103-5, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20250620225922id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_103/GS_103-5.html",
        "retrievedAt": "2025-06-20",
        "type": "statute"
      },
      {
        "id": "ny-0",
        "title": "N.Y. Lien Law § 3, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/3",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-1",
        "title": "N.Y. Lien Law § 10, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-2",
        "title": "N.Y. Lien Law § 10, New York State Senate",
        "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
        "retrievedAt": "2026-09-22",
        "type": "statute"
      },
      {
        "id": "ny-3",
        "title": "N.Y. Lien Law § 11, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-4",
        "title": "N.Y. Lien Law § 11-b, New York State Senate",
        "url": "https://web.archive.org/web/20250418044502id_/https://www.nysenate.gov/legislation/laws/LIE/11-B",
        "retrievedAt": "2025-04-18",
        "type": "statute"
      },
      {
        "id": "ny-5",
        "title": "N.Y. Lien Law § 11-b, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/11-B",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-6",
        "title": "N.Y. Lien Law § 17, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-7",
        "title": "N.Y. Gen. Constr. Law § 20, New York State Senate",
        "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
        "retrievedAt": "2025-11-08",
        "type": "statute"
      },
      {
        "id": "ny-8",
        "title": "N.Y. Gen. Constr. Law § 25-a, New York State Senate",
        "url": "https://web.archive.org/web/20250825120112id_/https://www.nysenate.gov/legislation/laws/GCN/25-A",
        "retrievedAt": "2025-08-25",
        "type": "statute"
      },
      {
        "id": "ny-9",
        "title": "N.Y. Gen. Constr. Law § 24, New York State Senate",
        "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
        "retrievedAt": "2026-02-11",
        "type": "statute"
      },
      {
        "id": "oh-0",
        "title": "Ohio Rev. Code ch. 1311, Ohio Laws",
        "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
        "retrievedAt": "2026-05-20",
        "type": "statute"
      },
      {
        "id": "oh-1",
        "title": "Ohio Rev. Code § 1.14, Ohio Laws",
        "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
        "retrievedAt": "2026-06-12",
        "type": "statute"
      },
      {
        "id": "tx-0",
        "title": "Tex. Prop. Code ch. 53, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "tx-1",
        "title": "Tex. Gov't Code ch. 311, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.311.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "tx-2",
        "title": "Tex. Prop. Code ch. 1, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.1.htm",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "tx-3",
        "title": "Tex. Gov't Code ch. 662, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      }
    ],
    "changelog": [
      {
        "date": "2026-10-01",
        "change": "Dataset first published: 9 of 51 jurisdictions published",
        "fields": []
      }
    ],
    "fieldNotes": {
      "projectType": "A rule's projectType \"commercial\" covers every project outside the state's residential definition, and the site displays it as \"Other than residential\". \"residential\" follows the residentialDefinition of the record; \"any\" is both."
    }
  },
  "records": [
    {
      "jurisdiction": "AZ",
      "name": "Arizona",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Ariz. Rev. Stat. §§ 33-981 to 33-1008",
      "statuteUrl": "https://www.azleg.gov/ars/33/00993.htm",
      "summary": "Arizona gives 120 days after completion to record a lien, or 60 days after a notice of completion is recorded, and six months after recording to bring an action to enforce it and record a notice of pendency of action. Claimants other than wage laborers serve a preliminary twenty day notice within 20 days after first furnishing to the jobsite.",
      "effectiveOrAmended": "Section 33-992.01 was amended by Laws 2024, ch. 89 (H.B. 2110), approved April 8, 2024.",
      "quotes": [
        {
          "id": "az-q1",
          "text": "Except for a person performing actual labor for wages, every person who furnishes labor, professional services, materials, machinery, fixtures or tools for which a lien otherwise may be claimed under this article shall, as a necessary prerequisite to the validity of any claim of lien, serve the owner or reputed owner, the original contractor or reputed contractor, the construction lender, if any, or reputed construction lender, if any, and the person with whom the claimant has contracted for the purchase of those items with a written preliminary twenty day notice as prescribed by this section.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(B)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q2",
          "text": "shall be given not later than twenty days after the claimant has first furnished labor, professional services, materials, machinery, fixtures or tools to the jobsite",
          "citation": "Ariz. Rev. Stat. § 33-992.01(C)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q3",
          "text": "The person, however, is entitled to claim a lien only for such labor, professional services, materials, machinery, fixtures or tools furnished within twenty days before the service of the notice and at any time thereafter.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(E)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q4",
          "text": "The notice or notices required by this section may be given by mailing the notice by first class mail sent with a certificate of mailing, registered or certified mail, postage prepaid in all cases, addressed to the person to whom notice is to be given at the person's residence or business address. Service is complete at the time of the deposit of notice in the mail.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(F)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q5",
          "text": "An Act amending section 33-992.01, Arizona Revised Statutes; relating to mechanics' and materialmen's liens.",
          "citation": "Laws 2024, ch. 89 (H.B. 2110)",
          "url": "https://www.azleg.gov/legtext/56leg/2R/laws/0089.htm",
          "sourceId": "az-1",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q6",
          "text": "within one hundred twenty days after completion of a building, structure or improvement, or any alteration or repair of such building, structure or improvement, or if a notice of completion has been recorded, within sixty days after recordation of such notice",
          "citation": "Ariz. Rev. Stat. § 33-993(A)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q7",
          "text": "such person shall have one hundred twenty days from completion as defined in section 33-993 to impress and secure the lien provided for in this article.",
          "citation": "Ariz. Rev. Stat. § 33-993(I)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q8",
          "text": "within a reasonable time thereafter serve the remaining copy upon the owner of the building, structure or improvement, if he can be found within the county.",
          "citation": "Ariz. Rev. Stat. § 33-993(A)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q9",
          "text": "A lien granted under the provisions of this article shall not continue for a longer period than six months after it is recorded, unless action is brought within that period to enforce the lien and a notice of pendency of action is recorded pursuant to section 12-1191 in the office of the county recorder in the county where the property is located.",
          "citation": "Ariz. Rev. Stat. § 33-998(A)",
          "url": "https://www.azleg.gov/ars/33/00998.htm",
          "sourceId": "az-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q10",
          "text": "No lien provided for in this article shall be allowed or recorded by the person claiming a lien against the dwelling of a person who became an owner-occupant prior to the construction, alteration, repair or improvement, except by a person having executed in writing a contract directly with the owner-occupant.",
          "citation": "Ariz. Rev. Stat. § 33-1002(B)",
          "url": "https://www.azleg.gov/ars/33/01002.htm",
          "sourceId": "az-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q11",
          "text": "B. For purposes of this section, if a work of improvement consists of the construction for residential occupancy of more than one separate building without regard to whether the buildings are constructed pursuant to separate contracts or a single contract, each building is a separate work and the time within which to perfect a lien by recording the notice of lien pursuant to subsection A of this section commences to run on the completion of each separate building. For purposes of this subsection, \"separate building\" means one structure of a work of improvement and any garages or other appurtenant buildings in a multibuilding residential project or residential subdivision.",
          "citation": "Ariz. Rev. Stat. § 33-993(B)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q12",
          "text": "C. For the purposes of subsection A of this section, \"completion\" means the earliest of the following events: 1. Thirty days after final inspection and written final acceptance by the governmental body which issued the building permit for the building, structure or improvement. 2. Cessation of labor for a period of sixty consecutive days, except when such cessation of labor is due to a strike, shortage of materials or act of God.",
          "citation": "Ariz. Rev. Stat. § 33-993(C)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q13",
          "text": "D. If no building permit is issued or if the governmental body that issued the building permit for the building, structure or improvement does not issue final inspections and written final acceptances, then \"completion\" for the purposes of subsection A of this section means the last date on which any labor, materials, fixtures or tools were furnished to the property.",
          "citation": "Ariz. Rev. Stat. § 33-993(D)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q14",
          "text": "I. If a notice of completion has been recorded, the person recording the notice, within fifteen days of recording, shall mail by certified or registered mail postage prepaid a copy of the notice of completion and a written statement of the date of recording and the county recorder's record location information to the original contractor and all persons from whom the owner has previously received a preliminary twenty day notice. In the event the owner or its agent fails to mail a copy of the notice of completion and a written statement of the date of recording and the county recorder's record location information within fifteen days of recording to any person from whom the owner has received a preliminary twenty day notice, such person shall have one hundred twenty days from completion as defined in section 33-993 to impress and secure the lien provided for in this article.",
          "citation": "Ariz. Rev. Stat. § 33-993(I)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q15",
          "text": "the time in which an act is required to be done shall be computed by excluding the first day and including the last day, unless the last day is a holiday, and then it is also excluded.",
          "citation": "A.R.S. § 1-243(A)",
          "url": "https://www.azleg.gov/ars/1/00243.htm",
          "sourceId": "az-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q16",
          "text": "When anything of a secular nature, other than a work of necessity or charity, is provided or agreed to be done upon a day named or within a time named, and the day or the last day thereof falls on a holiday, it may be performed on the next ensuing business day with effect as though performed on the appointed day.",
          "citation": "A.R.S. § 1-303",
          "url": "https://www.azleg.gov/ars/1/00303.htm",
          "sourceId": "az-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q17",
          "text": "1. Sunday of each week.",
          "citation": "A.R.S. § 1-301(A)(1)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q18",
          "text": "A. The following days shall be holidays:",
          "citation": "A.R.S. § 1-301(A)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q19",
          "text": "B. When any of the holidays enumerated in subsection A of this section falls on a Sunday, the following Monday shall be observed as a holiday, with the exception of the holidays enumerated in subsection A, paragraphs 1, 5, 7, 8, 10, 11 and 13 of this section.",
          "citation": "A.R.S. § 1-301(B)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q20",
          "text": "C. When any of the holidays enumerated in subsection A, paragraphs 2, 9, 15 and 17 of this section falls on a Saturday, the preceding Friday shall be observed as a holiday.",
          "citation": "A.R.S. § 1-301(C)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "az-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "Serving the notice is a necessary prerequisite to the validity of any claim of lien. A late notice supports a lien only for items furnished within twenty days before it is served and after.",
          "recipients": [
            "The owner or reputed owner",
            "The original contractor or reputed contractor",
            "The construction lender, if any, or reputed construction lender, if any",
            "The person with whom the claimant has contracted for the purchase of those items"
          ],
          "delivery": "May be given by first class mail sent with a certificate of mailing, or registered or certified mail, postage prepaid; service is complete when the notice is deposited in the mail.",
          "quoteIds": [
            "az-q1",
            "az-q2",
            "az-q3",
            "az-q4",
            "az-q5"
          ]
        },
        {
          "id": "az-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q1"
          ]
        },
        {
          "id": "az-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q6"
          ]
        },
        {
          "id": "az-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a notice of completion has been recorded",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q6",
            "az-q7"
          ]
        },
        {
          "id": "az-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Within a reasonable time after the claim is recorded, if the owner can be located within the county."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q8"
          ]
        },
        {
          "id": "az-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien does not continue longer than six months after it is recorded unless an action to enforce it is brought within that time and a notice of pendency of action is recorded.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q9"
          ]
        }
      ],
      "residential": [
        {
          "text": "No lien may be allowed or recorded against the dwelling of a person who became an owner-occupant before the work, except by a person who executed a written contract directly with the owner-occupant.",
          "quoteIds": [
            "az-q10"
          ]
        },
        {
          "text": "Where a work of improvement consists of the construction of more than one separate building for residential occupancy, under one contract or several, each building is a separate work, and the time to record a lien runs from the completion of each building.",
          "quoteIds": [
            "az-q11"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "For the lien period, completion means the earlier of 30 days after final inspection and written final acceptance by the government body that issued the building permit, and cessation of labor for 60 consecutive days, except when caused by a strike, shortage of materials or act of God.",
          "quoteIds": [
            "az-q12"
          ]
        },
        {
          "text": "Where no building permit is issued, or the government body that issued it does not issue final inspections and written final acceptances, completion for the lien period means the last date on which any labor, materials, fixtures or tools were furnished to the property.",
          "quoteIds": [
            "az-q13"
          ]
        },
        {
          "text": "A person who records a notice of completion must mail a copy, with the recording details, by certified or registered mail within 15 days of recording to the original contractor and to everyone from whom the owner received a preliminary twenty day notice. A person who gave that notice and is not mailed a copy within 15 days has 120 days from completion to secure the lien.",
          "quoteIds": [
            "az-q14"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "az-q15"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "az-q16",
            "az-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr./Civil Rights Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln/Washington Presidents' Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "az-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "az-q18",
          "az-q19",
          "az-q20"
        ]
      },
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "az-0",
        "az-1",
        "az-2",
        "az-3",
        "az-4",
        "az-5",
        "az-6",
        "az-7"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "CA",
      "name": "California",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Cal. Civ. Code §§ 8000 to 9566",
      "statuteUrl": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
      "summary": "In California a claim of lien is recorded before the earlier of 90 days after completion of the work of improvement and, if the owner records a notice of completion or cessation, 60 days after that recording for a direct contractor or 30 days after it for any other claimant. Every claimant except a laborer gives a preliminary notice within 20 days after first furnishing work; a direct contractor gives it only to the construction lender, if any.",
      "effectiveOrAmended": "Civil Code sections 8180 to 8466 were added by Stats. 2010, ch. 697 (SB 189), operative July 1, 2012.",
      "quotes": [
        {
          "id": "ca-q1",
          "text": "A preliminary notice shall be given not later than 20 days after the claimant has first furnished work on the work of improvement.",
          "citation": "Cal. Civ. Code § 8204(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
          "sourceId": "ca-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q2",
          "text": "The claimant shall, however, be entitled to record a lien, give a stop payment notice, and assert a claim against a payment bond only for work performed within 20 days prior to the service of the preliminary notice, and at any time thereafter.",
          "citation": "Cal. Civ. Code § 8204(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
          "sourceId": "ca-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q3",
          "text": "Compliance with this section is a necessary prerequisite to the validity of a lien claim or stop payment notice under this title.",
          "citation": "Cal. Civ. Code § 8200(c)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q4",
          "text": "notice by mail under this part shall be given by registered or certified mail, express mail, or overnight delivery by an express service carrier.",
          "citation": "Cal. Civ. Code § 8110",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8110",
          "sourceId": "ca-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q5",
          "text": "A claimant with a direct contractual relationship with an owner or reputed owner is required to give preliminary notice only to the construction lender or reputed construction lender, if any.",
          "citation": "Cal. Civ. Code § 8200(e)(2)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q6",
          "text": "A laborer is not required to give preliminary notice.",
          "citation": "Cal. Civ. Code § 8200(e)(1)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q7",
          "text": "A direct contractor may not enforce a lien unless the contractor records a claim of lien after the contractor completes the direct contract, and before the earlier of the following times: (a) Ninety days after completion of the work of improvement. (b) Sixty days after the owner records a notice of completion or cessation.",
          "citation": "Cal. Civ. Code § 8412",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
          "sourceId": "ca-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q8",
          "text": "If the owner fails to give notice to a person as required by subdivision (a), the notice is ineffective to shorten the time within which that person may record a claim of lien under Sections 8412 and 8414.",
          "citation": "Cal. Civ. Code § 8190(c)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q9",
          "text": "A claimant other than a direct contractor may not enforce a lien unless the claimant records a claim of lien within the following times: (a) After the claimant ceases to provide work. (b) Before the earlier of the following times: (1) Ninety days after completion of the work of improvement. (2) Thirty days after the owner records a notice of completion or cessation.",
          "citation": "Cal. Civ. Code § 8414",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8414",
          "sourceId": "ca-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q10",
          "text": "The claimant shall commence an action to enforce a lien within 90 days after recordation of the claim of lien. If the claimant does not commence an action to enforce the lien within that time, the claim of lien expires and is unenforceable.",
          "citation": "Cal. Civ. Code § 8460",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8460",
          "sourceId": "ca-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q11",
          "text": "(3) Cessation of labor for a continuous period of 60 days. (4) Recordation of a notice of cessation after cessation of labor for a continuous period of 30 days.",
          "citation": "Cal. Civ. Code § 8180(a)(3)-(4)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8180",
          "sourceId": "ca-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q12",
          "text": "An owner may record a notice of completion on or within 15 days after the date of completion of a work of improvement.",
          "citation": "Cal. Civ. Code § 8182(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8182",
          "sourceId": "ca-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q13",
          "text": "An owner that records a notice of completion or cessation shall, within 10 days of the date the notice of completion or cessation is filed for record, give a copy of the notice to all of the following persons: (1) A direct contractor. (2) A claimant that has given the owner preliminary notice.",
          "citation": "Cal. Civ. Code § 8190(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q14",
          "text": "A person that occupies the real property as a personal residence, if the dwelling contains four or fewer residential units.",
          "citation": "Cal. Civ. Code § 8190(d)(1)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q15",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day, and including the last, unless the last day is a holiday, and then it is also excluded.",
          "citation": "Cal. Code Civ. Proc. § 12",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12",
          "sourceId": "ca-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q16",
          "text": "For purposes of this part, “day” means a calendar day.",
          "citation": "Cal. Civ. Code § 8058",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8058",
          "sourceId": "ca-10",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q17",
          "text": "If the last day for the performance of any act provided or required by law to be performed within a specified period of time is a holiday, then that period is hereby extended to and including the next day that is not a holiday. For purposes of this section, “holiday” means all day on Saturdays, all holidays specified in Section 135 and, to the extent provided in Section 12b, all days that by terms of Section 12b are required to be considered as holidays.",
          "citation": "Cal. Code Civ. Proc. § 12a(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
          "sourceId": "ca-11",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q18",
          "text": "applies to Sections 659, 659a, and 921, and to all other provisions of law providing or requiring an act to be performed on a particular day or within a specified period of time, whether expressed in this or any other code or statute, ordinance, rule, or regulation.",
          "citation": "Cal. Code Civ. Proc. § 12a(b)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
          "sourceId": "ca-11",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q19",
          "text": "Every full day designated as a holiday by Section 6700 of the Government Code, including that Thursday of November declared by the President to be Thanksgiving Day, is a judicial holiday, except",
          "citation": "Cal. Code Civ. Proc. § 135",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
          "sourceId": "ca-12",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q20",
          "text": "Every Saturday and the day after Thanksgiving Day are judicial holidays.",
          "citation": "Cal. Code Civ. Proc. § 135",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
          "sourceId": "ca-12",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q21",
          "text": "If any city, county, state, or public office, other than a branch office, is closed for the whole of any day, insofar as the business of that office is concerned, that day shall be considered as a holiday for the purposes of computing time under Sections 12 and 12a.",
          "citation": "Cal. Code Civ. Proc. § 12b",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12b",
          "sourceId": "ca-13",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ca-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "Giving the notice is a necessary prerequisite to the validity of a lien claim. A claimant that gives it late may record a lien only for work performed within 20 days before the notice was served and after.",
          "recipients": null,
          "delivery": "Notice by mail is given by registered or certified mail, express mail, or overnight delivery by an express service carrier.",
          "quoteIds": [
            "ca-q1",
            "ca-q2",
            "ca-q3",
            "ca-q4"
          ]
        },
        {
          "id": "ca-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The construction lender or reputed construction lender, if any"
          ],
          "delivery": null,
          "quoteIds": [
            "ca-q5",
            "ca-q1"
          ]
        },
        {
          "id": "ca-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q6"
          ]
        },
        {
          "id": "ca-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "A direct contractor may not enforce a lien unless it records the claim of lien after it completes the direct contract and before the earlier of the two times the statute sets.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q7",
            "ca-q8"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of completion or cessation is recorded"
            }
          ]
        },
        {
          "id": "ca-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 30
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "A claimant other than a direct contractor may not enforce a lien unless it records the claim of lien after it ceases to provide work and before the earlier of the two times the statute sets.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q9",
            "ca-q8"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of completion or cessation is recorded"
            }
          ]
        },
        {
          "id": "ca-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If no action is commenced within that time, the claim of lien expires and is unenforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q10"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Completion of the work of improvement includes cessation of labor for a continuous period of 60 days, and the recording of a notice of cessation after labor has ceased for a continuous period of 30 days.",
          "quoteIds": [
            "ca-q11"
          ]
        },
        {
          "text": "An owner may record a notice of completion on or within 15 days after the date of completion.",
          "quoteIds": [
            "ca-q12"
          ]
        },
        {
          "text": "An owner that records a notice of completion or cessation must give a copy within 10 days to the direct contractor and to each claimant that gave the owner preliminary notice. Without that copy, the notice does not shorten that person's time to record a claim of lien. The copy duty does not apply to some owners, including one that occupies the property as a personal residence in a dwelling of four or fewer units.",
          "quoteIds": [
            "ca-q13",
            "ca-q8",
            "ca-q14"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ca-q15",
            "ca-q16"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ca-q17",
            "ca-q18"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr. Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Third Monday in February",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Farmworkers Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 3,
            "day": 31,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Last Monday in May",
            "quoteId": "ca-q19",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "July 4",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "First Monday in September",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Native American Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 5,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": "CCP § 135 says the Thursday of November declared by the President; modeled as the fourth Thursday."
          },
          {
            "name": "Day after Thanksgiving",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 5,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": "Follows the Thanksgiving model."
          },
          {
            "name": "December 25",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ca-q19",
          "ca-q20"
        ],
        "closure": {
          "clause": "on which a city, county, state, or public office, other than a branch office, is closed for the whole of the day",
          "place": "the office",
          "quoteIds": [
            "ca-q17",
            "ca-q21"
          ]
        }
      },
      "eventWording": [
        {
          "event": "notice-of-completion",
          "clause": "a notice of completion or cessation is recorded",
          "input": "Notice of completion or cessation recorded on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "ca-0",
        "ca-1",
        "ca-2",
        "ca-3",
        "ca-4",
        "ca-5",
        "ca-6",
        "ca-7",
        "ca-8",
        "ca-9",
        "ca-10",
        "ca-11",
        "ca-12",
        "ca-13"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "FL",
      "name": "Florida",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Fla. Stat. ch. 713, part I",
      "statuteUrl": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
      "summary": "Florida sets 90 days after a lienor's final furnishing to record a claim of lien and one year after recording to start an action, with shorter periods after a termination of the original contract or an owner's notice of contest of lien. Lienors not in privity with the owner, other than laborers, serve a notice to owner not later than 45 days after they begin to furnish, and in any event before the owner disburses the final payment.",
      "effectiveOrAmended": "The 2025 Florida Statutes. Section 713.06 was last amended by ch. 2003-177, sections 713.08 and 713.015 by ch. 2007-221, and sections 713.13, 713.18, 713.21 and 713.22 by ch. 2023-226.",
      "quotes": [
        {
          "id": "fl-q1",
          "text": "The notice must be served before commencing, or not later than 45 days after commencing, to furnish his or her labor, services, or materials, but, in any event, before the date of the owner’s disbursement of the final payment after the contractor has furnished the affidavit under subparagraph (3)(d)1.",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q2",
          "text": "the failure to serve the notice, or to timely serve it, is a complete defense to enforcement of a lien by any person.",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q3",
          "text": "All lienors under this section, except laborers, as a prerequisite to perfecting a lien under this chapter and recording a claim of lien, must serve a notice on the owner",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q4",
          "text": "The claim of lien may be recorded at any time during the progress of the work or thereafter but not later than 90 days after the final furnishing of the labor or services or materials by the lienor.",
          "citation": "Fla. Stat. § 713.08(5)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q5",
          "text": "However, if the original contract is terminated under s. 713.07(4), a claim for a lien attaching prior to such termination may not be recorded after 90 days following the date of such termination or 90 days after the final furnishing of labor, services, or materials by the lienor, whichever occurs first.",
          "citation": "Fla. Stat. § 713.08(5)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q6",
          "text": "Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial to any person entitled to rely on the service.",
          "citation": "Fla. Stat. § 713.08(4)(c)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q7",
          "text": "A lien provided by this part does not continue for a longer period than 1 year after the claim of lien has been recorded or 1 year after the recording of an amended claim of lien that shows a later date of final furnishing of labor, services, or materials, unless within that time an action to enforce the lien is commenced in a court of competent jurisdiction.",
          "citation": "Fla. Stat. § 713.22(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q8",
          "text": "The lien of any lienor upon whom such notice is served and who fails to institute a suit to enforce his or her lien within 60 days after service of such notice is extinguished automatically.",
          "citation": "Fla. Stat. § 713.22(2)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q9",
          "text": "Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision printed in no less than 12-point, capitalized, boldfaced type",
          "citation": "Fla. Stat. § 713.015(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q10",
          "text": "If the improvement described in the notice of commencement is not actually commenced within 90 days after the recording thereof, such notice is void and of no further effect.",
          "citation": "Fla. Stat. § 713.13(2)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q11",
          "text": "In computing any time period under this part, if the last day of the time period is a Saturday, Sunday, or holiday specified in s. 110.117(1), or any day observed as a holiday by the clerk’s office or designated as a holiday by the chief judge of the circuit, the time period is extended to the end of the next business day.",
          "citation": "Fla. Stat. § 713.011(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q12",
          "text": "The following holidays shall be paid holidays observed by all state branches and agencies:",
          "citation": "Fla. Stat. § 110.117(1)",
          "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
          "sourceId": "fl-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "fl-q13",
          "text": "If any of these holidays falls on Saturday, the preceding Friday shall be observed as a holiday. If any of these holidays falls on Sunday, the following Monday shall be observed as a holiday.",
          "citation": "Fla. Stat. § 110.117(1)",
          "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
          "sourceId": "fl-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        }
      ],
      "rules": [
        {
          "id": "fl-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 45
            }
          },
          "notComputed": null,
          "consequence": "Failing to serve the notice, or to serve it on time, is a complete defense to enforcement of a lien by any person.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q1",
            "fl-q2",
            "fl-q3"
          ]
        },
        {
          "id": "fl-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "In every case, as an outer limit",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before the owner disburses the final payment after the contractor has furnished its final payment affidavit."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q1"
          ]
        },
        {
          "id": "fl-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q3"
          ]
        },
        {
          "id": "fl-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q4"
          ]
        },
        {
          "id": "fl-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If the original contract is terminated under section 713.07(4)",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The earlier of 90 days after the termination and 90 days after the lienor's final furnishing."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q5"
          ]
        },
        {
          "id": "fl-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "Failing to serve the claim of lien before recording or within 15 days after recording makes it voidable to the extent the failure or delay is shown to have been prejudicial to a person with a right to rely on the service.",
          "recipients": null,
          "delivery": "In the manner provided in section 713.18.",
          "quoteIds": [
            "fl-q6"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is recorded"
            }
          ]
        },
        {
          "id": "fl-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q7"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien, or an amended claim of lien that shows a later date of final furnishing of labor, services, or materials, is recorded"
            }
          ]
        },
        {
          "id": "fl-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After the owner serves a notice of contest of lien",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days after service of the owner's notice of contest of lien."
          },
          "consequence": "The lien of a lienor that does not sue within that time is extinguished automatically.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q8"
          ]
        }
      ],
      "residential": [
        {
          "text": "A direct contract greater than $2,500 between an owner and a contractor for improvements to a single or multiple family dwelling of up to four units must contain the statute's notice, printed in at least 12-point, capitalized, boldfaced type.",
          "quoteIds": [
            "fl-q9"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "If the improvement described in a notice of commencement is not actually commenced within 90 days after the notice is recorded, the notice is void and of no further effect.",
          "quoteIds": [
            "fl-q10"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": null,
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "fl-q11"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Birthday of Martin Luther King, Jr.",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "fl-q12",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Friday after Thanksgiving",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 5,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": "Always the fourth Friday of November."
          },
          {
            "name": "Christmas Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "fl-q12",
          "fl-q13"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien is recorded",
          "input": "Claim of lien recorded on",
          "hint": "Leave empty if no claim of lien has been recorded. If an amended claim of lien that shows a later date of final furnishing was recorded, the date the amended claim was recorded. The 15-day service date and the deadline to sue then both count from that date."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "fl-0",
        "fl-1"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "GA",
      "name": "Georgia",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "O.C.G.A. §§ 44-14-360 to 44-14-368",
      "statuteUrl": "https://www.lexisnexis.com/hottopics/gacode/",
      "summary": "Georgia gives a claimant 90 days after the last labor, services or materials to file a claim of lien, two business days after filing to send the owner a copy, and 365 days after filing to commence a lien action. Where a notice of commencement is filed, a claimant without privity of contract with the contractor sends a notice to contractor within 30 days after the notice of commencement is filed or 30 days after the claimant's first delivery of labor, services or materials to the property, whichever is later.",
      "effectiveOrAmended": "Official Code of Georgia Annotated, current through the 2026 Special Session. Section 44-14-361.1 was last amended by Ga. L. 2021, p. 674 (HB 480); section 44-14-361.5 by Ga. L. 2014, p. 866 (SB 340); section 44-14-367 by Ga. L. 2008, p. 1063 (SB 374), which also enacted section 44-14-368.",
      "quotes": [
        {
          "id": "ga-q1",
          "text": "(a) To make good the liens specified in paragraphs (1), (2), and (6) through (9) of subsection (a) of Code Section 44-14-361, any person having a right to a lien who does not have privity of contract with the contractor and is providing labor, services, or materials for the improvement of property shall, within 30 days from the filing of the notice of commencement or 30 days following the first delivery of labor, services, or materials to the property, whichever is later, give a written notice to contractor as set out in subsection (c) of this Code section to the owner or the agent of the owner and to the contractor for a project on which there has been filed with the clerk of the superior court a notice of commencement setting forth therein the information required in subsection (b) of this Code section.",
          "citation": "O.C.G.A. § 44-14-361.5(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q2",
          "text": "(c) A notice to contractor shall be sent by registered or certified mail or statutory overnight delivery to the owner or the agent of the owner and to the contractor at the addresses set forth in the notice of commencement setting forth:",
          "citation": "O.C.G.A. § 44-14-361.5(c)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q3",
          "text": "(d) The failure to file a notice of commencement shall render the provisions of this Code section inapplicable.",
          "citation": "O.C.G.A. § 44-14-361.5(d)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q4",
          "text": "(10) “Subcontractor” means, but is not limited to, subcontractors having privity of contract with the contractor.",
          "citation": "O.C.G.A. § 44-14-360(10)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q5",
          "text": "(a) Prior to filing a claim of lien, a person having a lien under paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361 may at such person’s option file a preliminary notice of lien rights.",
          "citation": "O.C.G.A. § 44-14-361.3(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q6",
          "text": "(d) A person having a lien under paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361 may enforce the lien without filing a preliminary notice of lien.",
          "citation": "O.C.G.A. § 44-14-361.3(d)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q7",
          "text": "(1) “Contractor” means a contractor having privity of contract with the owner of the real estate.",
          "citation": "O.C.G.A. § 44-14-360(1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q8",
          "text": "(2) The filing for record of his or her claim of lien within 90 days after the completion of the work, the furnishing of the architectural services, or the furnishing or performing of such surveying, engineering services, or interior design services or within 90 days after the material or machinery is furnished in the office of the clerk of the superior court of the county where the property is located.",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q9",
          "text": "for satisfaction of a claim which became due on (specify the date the claim was due, which is the same as the last date the labor, services, or materials were supplied to the premises)",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q10",
          "text": "(a) To make good the liens specified in paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361, they must be created and declared in accordance with the following provisions, and on failure of any of them the lien shall not be effective or enforceable:",
          "citation": "O.C.G.A. § 44-14-361.1(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q11",
          "text": "No later than two business days after the date the claim of lien is filed of record, the lien claimant shall send a true and accurate copy of the claim of lien by registered or certified mail or statutory overnight delivery to the owner of the property or, if the owner’s address cannot be found, the contractor, as the agent of the owner; provided, however, that if the property owner is an entity on file with the Secretary of State’s Corporations Division, sending a copy of the claim of lien to the entity’s address or the registered agent’s address shall satisfy this requirement. In all cases in which a notice of commencement is filed with the clerk of the superior court pursuant to subsection (b) of Code Section 44-14-361.5, a lien claimant shall also send a copy of the claim of lien by registered or certified mail or statutory overnight delivery to the contractor at the address shown on the notice of commencement;",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q12",
          "text": "(.1) “Business day” means any day that is not a Saturday, Sunday, or legal holiday.",
          "citation": "O.C.G.A. § 44-14-360(.1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q13",
          "text": "(3) The commencement of a lien action for the recovery of the amount of the party’s claim within 365 days from the date of filing for record of his or her claim of lien. In addition, within 30 days after commencing such lien action, the party claiming the lien shall file a notice with the clerk of the superior court of the county wherein the subject lien was filed.",
          "citation": "O.C.G.A. § 44-14-361.1(a)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q14",
          "text": "Failure of a lien claimant to commence a lien action to collect the amount of his or her claim within 365 days from the date of filing the lien, or failure of the lien claimant to file the statutory notice of commencement of lien action in the county where the property is located, renders the claim of lien unenforceable.",
          "citation": "O.C.G.A. § 44-14-367",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q15",
          "text": "(a) An owner or an owner’s agent or attorney, or the contractor or contractor’s agent or attorney, may elect to shorten the time prescribed in which to commence a lien action to enforce any claim of lien by recording in the superior court clerk’s office a notice in substantially the following form, in boldface capital letters in at least 12 point font, along with proof of delivery upon the lien claimant:",
          "citation": "O.C.G.A. § 44-14-368(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q16",
          "text": "THE TIME WITHIN WHICH YOU MAY COMMENCE A LIEN ACTION TO ENFORCE YOUR LIEN IS LIMITED TO 60 DAYS FROM RECEIPT OF THIS NOTICE.",
          "citation": "O.C.G.A. § 44-14-368(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q17",
          "text": "(b) Not later than 15 days after the contractor physically commences work on the property, a notice of commencement shall be filed by the owner, the agent of the owner, or by the contractor with the clerk of the superior court in the county in which the project is located.",
          "citation": "O.C.G.A. § 44-14-361.5(b)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q18",
          "text": "(3) Computation of time. Except as otherwise provided by time period computations specifically applying to other laws, when a period of time measured in days, weeks, months, years, or other measurements of time except hours is prescribed for the exercise of any privilege or the discharge of any duty, the first day shall not be counted but the last day shall be counted; and, if the last day falls on Saturday or Sunday, the party having such privilege or duty shall have through the following Monday to exercise the privilege or to discharge the duty.",
          "citation": "O.C.G.A. § 1-3-1(d)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q19",
          "text": "When the last day prescribed for such action falls on a public and legal holiday as set forth in Code Section 1-4-1, the party having the privilege or duty shall have through the next business day to exercise the privilege or to discharge the duty.",
          "citation": "O.C.G.A. § 1-3-1(d)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q20",
          "text": "(a) The State of Georgia shall recognize and observe as public and legal holidays:",
          "citation": "O.C.G.A. § 1-4-1(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q21",
          "text": "(1) All days which have been designated as of January 1, 2022, as public and legal holidays by the federal government; and",
          "citation": "O.C.G.A. § 1-4-1(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q22",
          "text": "(2) All other days designated and proclaimed by the Governor as public and legal holidays or as days of fasting and prayer or other religious observance.",
          "citation": "O.C.G.A. § 1-4-1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ga-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "Where a notice of commencement has been filed; for a claimant without privity of contract with the contractor",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "laterOf": [
                "first-furnishing",
                "notice-of-commencement"
              ]
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner or the owner's agent",
            "The contractor"
          ],
          "delivery": "Registered or certified mail or statutory overnight delivery, to the addresses in the notice of commencement.",
          "quoteIds": [
            "ga-q1",
            "ga-q2",
            "ga-q3",
            "ga-q4"
          ],
          "eventWording": [
            {
              "event": "notice-of-commencement",
              "clause": "a notice of commencement is filed"
            }
          ]
        },
        {
          "id": "ga-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q5",
            "ga-q6",
            "ga-q1",
            "ga-q7",
            "ga-q4"
          ]
        },
        {
          "id": "ga-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If the claim of lien is not filed for record within this time, the lien is not effective or enforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q8",
            "ga-q9",
            "ga-q10"
          ]
        },
        {
          "id": "ga-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "business-days",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner of the property or, if the owner's address cannot be located, the contractor as the owner's agent",
            "The contractor at the address in the notice of commencement, where one is filed"
          ],
          "delivery": "Registered or certified mail or statutory overnight delivery.",
          "quoteIds": [
            "ga-q11",
            "ga-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ]
        },
        {
          "id": "ga-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 365
            }
          },
          "notComputed": null,
          "consequence": "Failing to commence the lien action within 365 days after filing, or to file the notice of commencement of lien action, renders the claim of lien unenforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q13",
            "ga-q14"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ]
        },
        {
          "id": "ga-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After the owner or the contractor records a notice of contest of lien",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days from receipt of the notice of contest of lien."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q15",
            "ga-q16"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "A notice of commencement is filed with the clerk of the superior court by the owner, the owner's agent or the contractor not later than 15 days after the contractor physically commences work on the property.",
          "quoteIds": [
            "ga-q17"
          ]
        },
        {
          "text": "If no notice of commencement is filed, the section requiring a notice to contractor does not apply.",
          "quoteIds": [
            "ga-q3"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ga-q18"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ga-q18",
            "ga-q19"
          ]
        },
        "businessDays": {
          "quoteIds": [
            "ga-q12"
          ]
        },
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ga-q20",
          "ga-q21",
          "ga-q22"
        ]
      },
      "eventWording": [
        {
          "event": "notice-of-commencement",
          "clause": "a notice of commencement is filed",
          "input": "Notice of commencement filed on",
          "hint": "Leave empty if none has been filed."
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is filed",
          "input": "Claim of lien filed on",
          "hint": "Leave empty if no claim of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "ga-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "IL",
      "name": "Illinois",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "770 ILCS 60 (Mechanics Lien Act)",
      "statuteUrl": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
      "summary": "In Illinois a direct contractor files a claim for lien or brings an action within 4 months after completion, or after extra or additional work is completed or extra or additional materials are finally delivered, to enforce the lien against other creditors, encumbrancers and purchasers, and files within 2 years after the contract or any extra work is completed, or any extra materials are furnished, as to the owner. Subcontractors, sub-subcontractors, suppliers and laborers serve a notice within 90 days after completing their own contract and file within the time limits set for the contractor.",
      "effectiveOrAmended": "Sections 5, 21 and 24 were amended by P.A. 103-827, effective January 1, 2025; section 7 by P.A. 96-654, effective January 1, 2010; section 34 by P.A. 100-1061, effective January 1, 2019.",
      "quotes": [
        {
          "id": "il-q1",
          "text": "shall within 90 days after the completion thereof, or, if extra or additional work or material is delivered thereafter, within 90 days after the date of completion of such extra or additional work or final delivery of such extra or additional material, cause a written notice of his or her claim and the amount due or to become due thereunder, to be provided to the owner of record or the owner of record's agent or architect, or the superintendent having charge of the building or improvement and to the lending agency, if known",
          "citation": "770 ILCS 60/24(a)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q2",
          "text": "Notice shall be considered served at the time the written notice is placed with the delivery service or in the mail.",
          "citation": "770 ILCS 60/24(a)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q3",
          "text": "It shall be the duty of each subcontractor who has furnished, or is furnishing, labor, services, material, fixtures, apparatus or machinery, or forms or form work for an existing owner-occupied single family residence, in order to preserve the subcontractor's lien",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q4",
          "text": "to notify the occupant either personally or by certified mail, return receipt requested, addressed to the occupant or the occupant's agent of the residence within 60 days from the subcontractor's first furnishing labor",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q5",
          "text": "any notice given after 60 days by the subcontractor shall preserve the subcontractor's lien, but only to the extent that the owner has not been prejudiced by payments made prior to receipt of the notice",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q6",
          "text": "(a) No contractor shall be allowed to enforce such lien against or to the prejudice of any other creditor or incumbrancer or purchaser, unless within 4 months after completion, or if extra or additional work is done or labor, services, material, fixtures, apparatus or machinery, forms or form work is delivered therefor within 4 months after the completion of such extra or additional work or the final delivery of such extra or additional labor, services, material, fixtures, apparatus or machinery, forms or form work, he or she shall either bring an action to enforce his or her lien therefor or shall file in the office of the recorder of the county in which the building, erection or other improvement to be charged with the lien is situated, a claim for lien",
          "citation": "770 ILCS 60/7(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q7",
          "text": "as to the owner may be filed at any time after the contract is made and within 2 years after the completion of the contract, or the completion of any extra work or the furnishing of any extra labor, services, material, fixtures, apparatus or machinery, forms or form work thereunder",
          "citation": "770 ILCS 60/7(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q8",
          "text": "then such person may file a claim for lien or file a complaint and enforce such lien within the same limits as to time and in such other manner as hereinbefore provided for the contractor in Section 7 and Sections 9 to 20 inclusive, of this Act",
          "citation": "770 ILCS 60/28",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q9",
          "text": "A contractor for improvements of an owner-occupied single-family residence must give the owner written notice within 10 days after recording a lien against any property of the owner.",
          "citation": "770 ILCS 60/7(d)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q10",
          "text": "If timely notice is not given and, as a result, the owner has suffered damages before notice is given, the lien is extinguished to the extent of the damages.",
          "citation": "770 ILCS 60/7(d)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q11",
          "text": "Such suit shall be commenced or counterclaim filed within two years after the completion of the contract, or completion of the extra or additional work, or furnishing of extra or additional material thereunder.",
          "citation": "770 ILCS 60/9",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q12",
          "text": "Upon written demand of the owner, lienor, a recorder under Section 3-5010.8 of the Counties Code, or any person interested in the real estate, or their agent or attorney, served on the person claiming the lien, or his agent or attorney, requiring suit to be commenced to enforce the lien or answer to be filed in a pending suit, suit shall be commenced or answer filed within 30 days thereafter, or the lien shall be forfeited.",
          "citation": "770 ILCS 60/34(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q13",
          "text": "The time within which any act provided by law is to be done shall be computed by excluding the first day and including the last,",
          "citation": "5 ILCS 70/1.11",
          "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
          "sourceId": "il-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-02"
        },
        {
          "id": "il-q14",
          "text": "unless the last day is Saturday or Sunday or is a holiday as defined or fixed in any statute now or hereafter in force in this State, and then it shall also be excluded. If the day succeeding such Saturday, Sunday or holiday is also a holiday or a Saturday or Sunday then such succeeding day shall also be excluded.",
          "citation": "5 ILCS 70/1.11",
          "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
          "sourceId": "il-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-02"
        },
        {
          "id": "il-q15",
          "text": "The following days shall be legal holidays in the State of Illinois upon which day a bank may, but is not required to, remain closed:",
          "citation": "205 ILCS 630/17(a)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        },
        {
          "id": "il-q16",
          "text": "the days upon which the general elections for members of the House of Representatives are held, and any day proclaimed by the Governor of this State as a legal holiday.",
          "citation": "205 ILCS 630/17(a)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        },
        {
          "id": "il-q17",
          "text": "When any such holidays, except Juneteenth National Freedom Day, fall on Sunday, the Monday next following shall be held and considered such holiday.",
          "citation": "205 ILCS 630/17(d)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        }
      ],
      "rules": [
        {
          "id": "il-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 90 days after the claimant's own contract is completed, or after completion of extra or additional work or final delivery of extra or additional material."
          },
          "consequence": null,
          "recipients": null,
          "delivery": "The notice is served when it is placed with the delivery service or in the mail.",
          "quoteIds": [
            "il-q1",
            "il-q2"
          ]
        },
        {
          "id": "il-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For work on an existing owner-occupied single family residence",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "A notice given after 60 days preserves the lien only to the extent the owner has not been prejudiced by payments made before receiving it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q3",
            "il-q4",
            "il-q5"
          ]
        },
        {
          "id": "il-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Against or to the prejudice of any other creditor or incumbrancer or purchaser",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": "A contractor that neither files the claim for lien nor brings an action within this time may not enforce the lien against or to the prejudice of any other creditor, encumbrancer or purchaser.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "completion, or the completion of extra or additional work or the final delivery of extra or additional labor, services, material, fixtures, apparatus or machinery, forms or form work, occurs"
            }
          ]
        },
        {
          "id": "il-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "As to the owner",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q7"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the contract, or any extra work, is completed, or any extra labor, services, material, fixtures, apparatus or machinery, forms or form work is furnished under it"
            }
          ]
        },
        {
          "id": "il-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q8"
          ]
        },
        {
          "id": "il-service-0",
          "stage": "service",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For improvements of an owner-occupied single-family residence",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 10
            }
          },
          "notComputed": null,
          "consequence": "If timely notice is not given and the owner suffers damages as a result before notice is given, the lien is extinguished to the extent of the damages.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "il-q9",
            "il-q10"
          ]
        },
        {
          "id": "il-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q11"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the contract, or the extra or additional work, is completed, or extra or additional material is furnished under it"
            }
          ]
        },
        {
          "id": "il-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After a written demand of the owner, lienor, a recorder under Section 3-5010.8 of the Counties Code, or any person interested in the real estate, or their agent or attorney, requiring suit to be commenced or answer to be filed in a pending suit",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Suit commenced, or answer filed in a pending suit, within 30 days after the demand is served."
          },
          "consequence": "If suit is not commenced or an answer filed within that time, the lien is forfeited.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q12"
          ]
        },
        {
          "id": "il-enforcement-2",
          "stage": "enforcement",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q8",
            "il-q11"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "il-q13"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "il-q14"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s birthday",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Abraham Lincoln's birthday",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Casimir Pulaski's birthday",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 3,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "il-q15",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth National Freedom Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "il-q15",
          "il-q16",
          "il-q17"
        ]
      },
      "eventWording": [
        {
          "event": "completion",
          "clause": "completion occurs, or extra or additional work is completed, or extra or additional labor or material is finally delivered or furnished",
          "input": "Completion, or completion of extra or additional work, on",
          "hint": "If extra or additional work, labor or material was furnished under the contract, the date that work was completed or that labor or material was last delivered or furnished."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "il-0",
        "il-1",
        "il-2",
        "il-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NC",
      "name": "North Carolina",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "N.C. Gen. Stat. ch. 44A, art. 2",
      "statuteUrl": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
      "summary": "North Carolina counts both the claim of lien and the action to enforce it from the claimant's last furnishing at the site: 120 days to file the claim and 180 days to sue. Where the owner must designate a lien agent, a claimant gives the lien agent notice within 15 days after first furnishing.",
      "effectiveOrAmended": "Section 44A-11.2 was last amended by S.L. 2025-25; sections 44A-11, 44A-12 and 44A-13 by S.L. 2012-175.",
      "quotes": [
        {
          "id": "nc-q1",
          "text": "The lien agent identified in accordance with this section has received a Notice to Lien Agent from the potential lien claimant no later than 15 days after the first furnishing of labor or materials by the potential lien claimant.",
          "citation": "N.C. Gen. Stat. § 44A-11.2(l)(1)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q2",
          "text": "for which the costs of the undertaking are forty thousand dollars ($40,000) or more",
          "citation": "N.C. Gen. Stat. § 44A-11.1(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q3",
          "text": "Provided, however, that the owner is not required to designate a lien agent for improvements to an existing single‑family residential dwelling unit as defined in G.S. 87‑15.5(7) that is occupied by the owner as a residence",
          "citation": "N.C. Gen. Stat. § 44A-11.1(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q4",
          "text": "(2) Any of the following conditions is met: a. The lien agent identified in accordance with this section has received a Notice to Lien Agent from the potential lien claimant prior to the date of recordation of a conveyance of the property interest in the real property to a bona fide purchaser for value protected under G.S. 47‑18 who is not an affiliate, relative, or insider of the owner. b. The potential lien claimant has perfected its claim of lien on real property pursuant to G.S. 44A‑11 prior to the recordation of a conveyance of the property interest in the real property to a bona fide purchaser for value protected under G.S. 47‑18 who is not an affiliate, relative, or insider of the owner.",
          "citation": "N.C. Gen. Stat. § 44A-11.2(l)(2)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q5",
          "text": "Claims of lien on real property may be filed at any time after the maturity of the obligation secured thereby but not later than 120 days after the last furnishing of labor or materials at the site of the improvement by the person claiming the lien.",
          "citation": "N.C.G.S. § 44A-12(b)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q6",
          "text": "No such action may be commenced later than 180 days after the last furnishing of labor or materials at the site of the improvement by the person claiming the claim of lien on real property.",
          "citation": "N.C.G.S. § 44A-13(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q7",
          "text": "The time within which an act is to be done, as provided by law, shall be computed in the manner prescribed by Rule 6(a) of the Rules of Civil Procedure.",
          "citation": "N.C. Gen. Stat. § 1-593",
          "url": "https://web.archive.org/web/20260311222231id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1/GS_1-593.html",
          "sourceId": "nc-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-11"
        },
        {
          "id": "nc-q8",
          "text": "In computing any period of time prescribed or allowed by these rules, by order of court, or by any applicable statute, including rules, orders or statutes respecting publication of notices, the day of the act, event, default or publication after which the designated period of time begins to run is not to be included.",
          "citation": "N.C. Gen. Stat. § 1A-1, Rule 6(a)",
          "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
          "sourceId": "nc-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "nc-q9",
          "text": "The last day of the period so computed is to be included, unless it is a Saturday, Sunday or a legal holiday when the courthouse is closed for transactions, in which event the period runs until the end of the next day which is not a Saturday, Sunday, or a legal holiday when the courthouse is closed for transactions.",
          "citation": "N.C. Gen. Stat. § 1A-1, Rule 6(a)",
          "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
          "sourceId": "nc-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "nc-q10",
          "text": "Except as otherwise provided by law, when the day or the last day for doing any act required or permitted by law to be performed in a public office or courthouse falls on a Saturday, Sunday, or legal holiday when the public office or courthouse is closed for transactions, the act may be performed on the next day that the public office or courthouse is open for transactions.",
          "citation": "N.C. Gen. Stat. § 103-5(a)",
          "url": "https://web.archive.org/web/20250620225922id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_103/GS_103-5.html",
          "sourceId": "nc-3",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2025-06-20"
        }
      ],
      "rules": [
        {
          "id": "nc-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where the owner must designate a lien agent: improvements costing $40,000 or more, other than improvements to an existing single-family residential dwelling unit occupied by the owner as a residence",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "A claimant may perfect a claim of lien on real property only if the lien agent received the notice within this time, or if the lien agent received it, or the claimant perfected its lien, before a conveyance to a bona fide purchaser for value is recorded.",
          "recipients": [
            "The lien agent"
          ],
          "delivery": null,
          "quoteIds": [
            "nc-q1",
            "nc-q2",
            "nc-q3",
            "nc-q4"
          ]
        },
        {
          "id": "nc-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nc-q5"
          ]
        },
        {
          "id": "nc-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nc-q6"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "nc-q7",
            "nc-q8"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": false,
          "appliesTo": "all",
          "quoteIds": [
            "nc-q9"
          ]
        },
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [],
        "closure": {
          "clause": "that is a legal holiday when the courthouse is closed for transactions",
          "place": "the courthouse",
          "quoteIds": [
            "nc-q9",
            "nc-q10"
          ]
        }
      },
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "nc-0",
        "nc-1",
        "nc-2",
        "nc-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NY",
      "name": "New York",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "N.Y. Lien Law art. 2",
      "statuteUrl": "https://www.nysenate.gov/legislation/laws/LIE/10",
      "summary": "New York requires no preliminary notice on a private improvement. A notice of lien may be filed within eight months after the last item of work or materials, or four months for a single family dwelling, and lasts one year after filing unless within that time an action to foreclose is commenced and a notice of pendency is filed, or the lien is extended.",
      "effectiveOrAmended": "Sections 10, 11 and 17 in the revision dated September 22, 2014; section 11-b in the revision dated February 20, 2015.",
      "quotes": [
        {
          "id": "ny-q1",
          "text": "from the time of filing a notice of such lien as prescribed in this chapter",
          "citation": "N.Y. Lien Law § 3",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/3",
          "sourceId": "ny-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q2",
          "text": "within eight months after the completion of the contract, or the final performance of the work, or the final furnishing of the materials, dating from the last item of work performed or materials furnished",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q3",
          "text": "where the improvement is related to real property improved or to be improved with a single family dwelling, the notice of lien may be filed at any time during the progress of the work and the furnishing of the materials, or, within four months after the completion of the contract, or the final performance of the work, or the final furnishing of the materials, dating from the last item of work performed or materials furnished",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q4",
          "text": "where the notice of lien is for retainage, the notice of lien may be filed within ninety days after the date the retainage was due to be released",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q5",
          "text": "Within five days before or thirty days after filing the notice of lien, the lienor shall serve a copy of such notice upon the owner",
          "citation": "N.Y. Lien Law § 11",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
          "sourceId": "ny-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-06"
        },
        {
          "id": "ny-q6",
          "text": "Failure to file proof of such a service with the county clerk within thirty-five days after the notice of lien is filed shall terminate the notice as a lien.",
          "citation": "N.Y. Lien Law § 11",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
          "sourceId": "ny-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-06"
        },
        {
          "id": "ny-q7",
          "text": "Within five days before or thirty days after filing a notice of lien in accordance with section ten of this chapter or the filing of an amendment of notice of lien in accordance with section twelve-a of this chapter the lienor shall serve a copy of such notice or amendment by certified mail on the contractor, subcontractor, assignee or legal representative for whom he was employed or to whom he furnished materials",
          "citation": "N.Y. Lien Law § 11-b",
          "url": "https://web.archive.org/web/20250418044502id_/https://www.nysenate.gov/legislation/laws/LIE/11-B",
          "sourceId": "ny-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "ny-q8",
          "text": "A lienor having a direct contractual relationship with a subcontractor or a sub-subcontractor but not with a contractor shall also serve a copy of such notice or amendment by certified mail to the contractor.",
          "citation": "N.Y. Lien Law § 11-b",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11-B",
          "sourceId": "ny-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "ny-q9",
          "text": "No lien specified in this article shall be a lien for a longer period than one year after the notice of lien has been filed, unless within that time an action is commenced to foreclose the lien, and a notice of the pendency of such action",
          "citation": "N.Y. Lien Law § 17",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
          "sourceId": "ny-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q10",
          "text": "A lien on real property improved or to be improved with a single family dwelling may only be extended by an order of a court of record, or a judge or justice thereof.",
          "citation": "N.Y. Lien Law § 17",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
          "sourceId": "ny-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q11",
          "text": "where the improvement is related to real property improved or to be improved with a single family dwelling, the notice of lien may be filed at any time during the progress of the work and the furnishing of the materials, or, within four months after the completion of the contract",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q12",
          "text": "the term \"single family dwelling\" shall not include a dwelling unit which is a part of a subdivision that has been filed with a municipality in which the subdivision is located when at the time the lien is filed, such property in the subdivision is owned by the developer for purposes other than his personal residence.",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q13",
          "text": "A number of days specified as a period from a certain day within which or after or before which an act is authorized or required to be done means such number of calendar days exclusive of the calendar day from which the reckoning is made.",
          "citation": "N.Y. Gen. Constr. Law § 20",
          "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
          "sourceId": "ny-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-08"
        },
        {
          "id": "ny-q14",
          "text": "In computing any specified period of time from a specified event, the day upon which the event happens is deemed the day from which the reckoning is made. The day from which any specified period of time is reckoned shall be excluded in making the reckoning.",
          "citation": "N.Y. Gen. Constr. Law § 20",
          "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
          "sourceId": "ny-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-08"
        },
        {
          "id": "ny-q15",
          "text": "When any period of time, computed from a certain day, within which or after which or before which an act is authorized or required to be done, ends on a Saturday, Sunday or a public holiday, such act may be done on the next succeeding business day",
          "citation": "N.Y. Gen. Constr. Law § 25-a(1)",
          "url": "https://web.archive.org/web/20250825120112id_/https://www.nysenate.gov/legislation/laws/GCN/25-A",
          "sourceId": "ny-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-08-25"
        },
        {
          "id": "ny-q16",
          "text": "The term public holiday includes the following days in each year:",
          "citation": "N.Y. Gen. Constr. Law § 24",
          "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
          "sourceId": "ny-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-11"
        },
        {
          "id": "ny-q17",
          "text": "and if any of such days except Flag day is Sunday, the next day thereafter; each general election day, and each day appointed by the president of the United States or by the governor of this state as a day of general thanksgiving, general fasting and prayer, or other general religious observances.",
          "citation": "N.Y. Gen. Constr. Law § 24",
          "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
          "sourceId": "ny-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-11"
        }
      ],
      "rules": [
        {
          "id": "ny-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q1"
          ]
        },
        {
          "id": "ny-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 8
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q2"
          ]
        },
        {
          "id": "ny-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q3"
          ]
        },
        {
          "id": "ny-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a notice of lien for retainage",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "90 days after the date the retainage was due to be released."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q4"
          ]
        },
        {
          "id": "ny-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Failing to file proof of service with the county clerk within 35 days after the notice of lien is filed terminates the notice as a lien.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ny-q5",
            "ny-q6"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        },
        {
          "id": "ny-service-1",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The contractor, subcontractor, assignee or legal representative for whom the lienor was employed or to whom it furnished materials",
            "The contractor as well, when the lienor contracted with a subcontractor or sub-subcontractor but not with the contractor"
          ],
          "delivery": "Certified mail.",
          "quoteIds": [
            "ny-q7",
            "ny-q8"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien, or an amendment of notice of lien, is filed"
            }
          ],
          "mayChangeIf": "an amendment of the notice of lien is filed"
        },
        {
          "id": "ny-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q9"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        },
        {
          "id": "ny-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q9",
            "ny-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means real property improved or to be improved with a single family dwelling. A single family dwelling does not include a dwelling unit in a filed subdivision that, when the lien is filed, the developer owns for purposes other than the developer's personal residence.",
        "quoteIds": [
          "ny-q11",
          "ny-q12"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ny-q13",
            "ny-q14"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ny-q15"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr. day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln's birthday",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington's birthday",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial day",
            "quoteId": "ny-q16",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Flag day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 6,
            "weekday": 0,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ny-q16",
          "ny-q17"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the notice of lien is filed",
          "input": "Notice of lien filed on",
          "hint": "Leave empty if no notice of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "ny-0",
        "ny-1",
        "ny-2",
        "ny-3",
        "ny-4",
        "ny-5",
        "ny-6",
        "ny-7",
        "ny-8",
        "ny-9"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "OH",
      "name": "Ohio",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Ohio Rev. Code ch. 1311",
      "statuteUrl": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
      "summary": "Ohio gives 60 days after the last labor or material to file a lien affidavit for a one- or two-family dwelling or a residential condominium unit, and 75 days for other improvements except oil and gas wells. Where a notice of commencement is recorded, subcontractors and material suppliers serve a notice of furnishing within 21 days after first furnishing, or within 21 days after a late notice of commencement is recorded; the notice does not apply under a home construction contract.",
      "effectiveOrAmended": "Section 1311.04 as amended by H.B. 96 (136th General Assembly), effective September 30, 2025; section 1311.06 effective January 30, 2014; sections 1311.05 and 1311.13 effective March 30, 2007; sections 1311.07 and 1311.11 effective April 10, 1991.",
      "quotes": [
        {
          "id": "oh-q1",
          "text": "at any time after the recording of the notice of commencement or amended notice but within twenty-one days after performing the first labor or work or furnishing the first materials or within the extended time period provided for in division (I) or (J) of section 1311.04 of the Revised Code.",
          "citation": "Ohio Rev. Code § 1311.05(A)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q2",
          "text": "If the owner, part owner, lessee, or designee fails to record the notice of commencement in accordance with this section, the time within which a subcontractor or material supplier may serve a notice of furnishing as required by section 1311.05 of the Revised Code is extended until twenty-one days after the notice of commencement has been recorded.",
          "citation": "Ohio Rev. Code § 1311.04(I)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q3",
          "text": "Prior to the performance of any labor or work or the furnishing of any materials for an improvement on real property which may give rise to a mechanics' lien under sections 1311.01 to 1311.22 of the Revised Code, the owner, part owner, or lessee who contracts for the labor, work, or materials shall record in the office of the county recorder for each county in which the real property to be improved is located a notice of commencement in substantially the form specified in division (B) of this section.",
          "citation": "Ohio Rev. Code § 1311.04(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q4",
          "text": "This section does not apply to any improvement made pursuant to a home construction contract as defined in section 1311.011 of the Revised Code.",
          "citation": "Ohio Rev. Code § 1311.05(E)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q5",
          "text": "No original contractor has to serve a notice of furnishing to preserve lien rights arising from a contract with an owner, part owner, or lessee.",
          "citation": "Ohio Rev. Code § 1311.05(A)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q6",
          "text": "No laborer must serve a notice of furnishing in accordance with this section to preserve lien rights.",
          "citation": "Ohio Rev. Code § 1311.05(G)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q7",
          "text": "If the lien arises in connection with a one- or two-family dwelling or in connection with a residential unit of condominium property as defined in Chapter 5311. of the Revised Code, within sixty days from the date on which the last labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q8",
          "text": "within seventy-five days from the date on which the last of the labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(3)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q9",
          "text": "If the lien arises under section 1311.021 of the Revised Code, within one hundred twenty days from the date on which the last labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(2)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q10",
          "text": "shall serve a copy of the affidavit on the owner, part owner, or lessee of the improved property or his designee, within thirty days after filing the affidavit",
          "citation": "Ohio Rev. Code § 1311.07",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q11",
          "text": "(C) Liens under sections 1311.01 to 1311.22 of the Revised Code continue in force for six years after an affidavit is filed in the office of the county recorder under section 1311.06 of the Revised Code. If an action is brought to enforce the lien within that time, the lien continues in force until final adjudication thereof.",
          "citation": "Ohio Rev. Code § 1311.13(C)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q12",
          "text": "(A)(1) The owner, part owner, lessee, mortgagee, or any other person with an interest in real property upon which a lien has been taken, or any original contractor or subcontractor who has provided a bond, cash deposit, general obligation of any state government or of the United States government, obligation insured by an agency of the United States government, or other reasonable security in accordance with division (C) of this section, may notify the lienholder to commence suit on the lien, by written notice delivered to the lienholder in one of the following manners:",
          "citation": "Ohio Rev. Code § 1311.11(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q13",
          "text": "Except as otherwise provided in this section, the notice to commence suit shall be served by the sheriff of the county in which the land upon which the lien has been taken is situated, upon payment of the same mileage and fees as provided by law with respect to the service of summons.",
          "citation": "Ohio Rev. Code § 1311.11(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q14",
          "text": "If the lienholder fails to commence suit upon the lien within sixty days after completion of service upon him of the notice to commence suit, or if the action is commenced but dismissed with prejudice before adjudication, the lien is void and the property wholly discharged from the lien.",
          "citation": "Ohio Rev. Code § 1311.11(B)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q15",
          "text": "(O) This section does not apply to a home construction contract as defined in section 1311.011 of the Revised Code, except that when a lending institution as defined in division (A)(3) of section 1311.011 of the Revised Code requires that a notice of commencement be recorded as part of the financing for a home construction contract, which is secured in whole or in part by a mortgage on real estate upon which the improvements are to be constructed, the owner, part owner, or lessee may file a notice of commencement pursuant to this section",
          "citation": "Ohio Rev. Code § 1311.04(O)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q16",
          "text": "The time within which an act is required by law to be done shall be computed by excluding the first and including the last day;",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q17",
          "text": "except that, when the last day falls on Sunday or a legal holiday, the act may be done on the next succeeding day that is not Sunday or a legal holiday.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q18",
          "text": "\"Legal holiday\" as used in this section means the following days:",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q19",
          "text": "(L) Any day appointed and recommended by the governor of this state or the president of the United States as a holiday.",
          "citation": "Ohio Rev. Code § 1.14(L)",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q20",
          "text": "If any day designated in this section as a legal holiday falls on Sunday, the next succeeding day is a legal holiday.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q21",
          "text": "When a public office in which an act, required by law, is to be performed is closed to the public for the entire day that constitutes the last day for doing the act or before its usual closing time on that day, the act may be performed on the next succeeding day that is not a Sunday or a legal holiday as defined in this section.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        }
      ],
      "rules": [
        {
          "id": "oh-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "Where a notice of commencement is recorded; not for an improvement under a home construction contract",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "laterOf": [
                "first-furnishing",
                "notice-of-commencement"
              ]
            },
            "period": {
              "unit": "days",
              "n": 21
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q1",
            "oh-q2",
            "oh-q3",
            "oh-q4"
          ]
        },
        {
          "id": "oh-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q5"
          ]
        },
        {
          "id": "oh-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q6"
          ]
        },
        {
          "id": "oh-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q7"
          ]
        },
        {
          "id": "oh-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 75
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q8"
          ]
        },
        {
          "id": "oh-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If the lien arises under section 1311.021 of the Revised Code",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q9"
          ]
        },
        {
          "id": "oh-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner, part owner or lessee of the improved property, or the designee"
          ],
          "delivery": null,
          "quoteIds": [
            "oh-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "oh-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "If an action to enforce the lien is brought within that time, the lien continues in force until final adjudication.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "oh-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After a notice to commence suit, given by the owner, part owner, lessee, mortgagee or another person with an interest in the real property, or by an original contractor or subcontractor who has provided a bond or other reasonable security, is served",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days after service of the notice to commence suit is completed"
          },
          "consequence": "If the lienholder does not commence suit within that time, or the action is commenced but dismissed with prejudice before adjudication, the lien is void and the property is wholly discharged from it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q12",
            "oh-q13",
            "oh-q14"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Before any labor, work or materials are furnished for the improvement, the owner, part owner or lessee who contracts for them records a notice of commencement. This does not apply to a home construction contract, although the owner may record one when a lending institution requires it as part of the financing.",
          "quoteIds": [
            "oh-q3",
            "oh-q15"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "In these rules, residential means a one- or two-family dwelling or a residential unit of condominium property.",
        "quoteIds": [
          "oh-q7"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "oh-q16"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "oh-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington-Lincoln day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial day",
            "quoteId": "oh-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": false,
            "modelNote": "1.14(D) points to the day designated in 5 U.S.C. 6103 (the last Monday in May)."
          },
          {
            "name": "Juneteenth day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "oh-q18",
          "oh-q19",
          "oh-q20"
        ],
        "closure": {
          "clause": "on which the public office where the act is to be performed is closed to the public for the entire day or before its usual closing time",
          "place": "the office",
          "quoteIds": [
            "oh-q21"
          ]
        }
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien affidavit is filed",
          "input": "Lien affidavit filed on",
          "hint": "Leave empty if no lien affidavit has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "oh-0",
        "oh-1"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "TX",
      "name": "Texas",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Tex. Prop. Code ch. 53",
      "statuteUrl": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
      "summary": "Texas sets the lien affidavit deadline, and the deadline for each monthly notice of claim, on the 15th day of a later month after the month of the work, with shorter periods for residential construction projects. A claimant other than an original contractor must give monthly notices of claim for the lien to be valid.",
      "effectiveOrAmended": "The deadlines in Chapter 53 were rewritten by Acts 2021, 87th Legislature, Chapter 690 (H.B. 2237), effective January 1, 2022. Section 53.003 was amended by Acts 2025, 89th Legislature, Chapter 98 (S.B. 929), effective May 21, 2025.",
      "quotes": [
        {
          "id": "tx-q1",
          "text": "a claimant other than an original contractor must give the notice prescribed by Subsections (a-1) and (a-2) for the lien to be valid",
          "citation": "Tex. Prop. Code § 53.056(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q2",
          "text": "for projects other than residential construction projects, not later than the 15th day of the third month after the month during which: (A) the labor or materials were provided; or (B) the undelivered specially fabricated materials would normally have been delivered",
          "citation": "Tex. Prop. Code § 53.056(a-1)(1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q3",
          "text": "for residential construction projects, not later than the 15th day of the second month after the month during which: (A) the labor or materials were provided; or (B) the undelivered specially fabricated materials would normally have been delivered.",
          "citation": "Tex. Prop. Code § 53.056(a-1)(2)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q4",
          "text": "The claimant must send the notice of claim for unpaid retainage to the owner or reputed owner and the original contractor not later than the earlier of: (1) the 30th day after the date the claimant's contract is completed, terminated, or abandoned; or (2) the 30th day after the date the original contract is terminated or abandoned.",
          "citation": "Tex. Prop. Code § 53.057(a-1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q5",
          "text": "not later than the 15th day of the fourth month after the month in which the original contractor's work was completed, terminated, or abandoned",
          "citation": "Tex. Prop. Code § 53.052(a)(1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q6",
          "text": "for residential construction projects, not later than the 15th day of the third month after the month in which the original contractor's work was completed, terminated, or abandoned",
          "citation": "Tex. Prop. Code § 53.052(a)(2)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q7",
          "text": "(b) Except as provided by Subsection (c) or (d), a claimant other than an original contractor claiming the lien must file an affidavit with the county clerk not later than the 15th day of the fourth month after the later of: (1) the month the claimant last provided labor or materials; or (2) the month the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered.",
          "citation": "Tex. Prop. Code § 53.052(b)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q8",
          "text": "(c) A claimant other than an original contractor claiming a lien arising from a residential construction project must file an affidavit with the county clerk not later than the 15th day of the third month after the later of: (1) the month the claimant last provided labor or materials; or (2) the month the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered.",
          "citation": "Tex. Prop. Code § 53.052(c)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q9",
          "text": "A claimant other than an original contractor claiming a lien for retainage must file an affidavit with the county clerk not later than the 15th day of the third month after the month in which the original contract under which the claimant performed was completed, terminated, or abandoned.",
          "citation": "Tex. Prop. Code § 53.052(d)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q10",
          "text": "A person who files an affidavit must send a copy of the affidavit to the owner or reputed owner at the owner's last known business or residence address not later than the fifth day after the date the affidavit is filed with the county clerk.",
          "citation": "Tex. Prop. Code § 53.055(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q11",
          "text": "If the person is not an original contractor, the person must also send a copy of the affidavit to the original contractor at the original contractor's last known business or residence address within the same period.",
          "citation": "Tex. Prop. Code § 53.055(b)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q12",
          "text": "suit must be brought to foreclose the lien not later than the first anniversary of the last day a claimant may file the lien affidavit under Section 53.052",
          "citation": "Tex. Prop. Code § 53.158(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q13",
          "text": "\"Residential construction project\" means a project for the construction or repair of a new or existing residence, including improvements appurtenant to the residence, as provided by a residential construction contract.",
          "citation": "Tex. Prop. Code § 53.001(10)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q14",
          "text": "\"Residential construction contract\" means a contract between an owner and a contractor in which the contractor agrees to construct or repair the owner's residence, including improvements appurtenant to the residence.",
          "citation": "Tex. Prop. Code § 53.001(9)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q15",
          "text": "\"Residence\" means the real property and improvements for a single-family house, duplex, triplex, or quadruplex or a unit in a multiunit structure used for residential purposes in which title to the individual units is transferred to the owners under a condominium or cooperative system that is: (A) owned by one or more adult persons; and (B) used or intended to be used as a dwelling by one of the owners.",
          "citation": "Tex. Prop. Code § 53.001(8)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q16",
          "text": "To fix a lien on a homestead, the person who is to furnish material or perform labor and the owner must execute a written contract",
          "citation": "Tex. Prop. Code § 53.254(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q17",
          "text": "Before a residential construction contract is executed by the owner, the original contractor shall deliver to the owner a disclosure statement",
          "citation": "Tex. Prop. Code § 53.255(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q18",
          "text": "If the affidavit is filed after the 10th day after the date of completion, the date of completion for purposes of this subchapter is the date the affidavit is filed.",
          "citation": "Tex. Prop. Code § 53.106(d)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q19",
          "text": "In computing a period of days, the first day is excluded and the last day is included.",
          "citation": "Tex. Gov't Code § 311.014(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.311.htm",
          "sourceId": "tx-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q20",
          "text": "The Code Construction Act (Chapter 311, Government Code) applies to the construction of each provision in this code, except as otherwise expressly provided by this code.",
          "citation": "Tex. Prop. Code § 1.002",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.1.htm",
          "sourceId": "tx-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q21",
          "text": "In determining the deadline or computing the period of days in which to provide a notice or to take any action required under this chapter, if the deadline or the last day of the period is a Saturday, Sunday, or legal holiday, the period is extended to include the next day that is not a Saturday, Sunday, or legal holiday.",
          "citation": "Tex. Prop. Code § 53.003(e)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q22",
          "text": "A national holiday includes only the following days:",
          "citation": "Tex. Gov't Code § 662.003(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q23",
          "text": "A state holiday includes only the following days:",
          "citation": "Tex. Gov't Code § 662.003(b)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "tx-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the third month after that month."
          },
          "consequence": "A claimant other than an original contractor must give the notice for the lien to be valid.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q1",
            "tx-q2"
          ]
        },
        {
          "id": "tx-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the second month after that month."
          },
          "consequence": "A claimant other than an original contractor must give the notice for the lien to be valid.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q3",
            "tx-q1"
          ]
        },
        {
          "id": "tx-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a claim for unpaid retainage",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The earlier of the 30th day after the claimant's contract is completed, terminated or abandoned and the 30th day after the original contract is terminated or abandoned."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q4"
          ]
        },
        {
          "id": "tx-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q5"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contractor's work was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contractor's work was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later"
            }
          ]
        },
        {
          "id": "tx-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later"
            }
          ]
        },
        {
          "id": "tx-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a lien claim for retainage",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q9"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contract under which the claimant performed was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 5
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner or reputed owner",
            "The original contractor as well, when the claimant is not an original contractor"
          ],
          "delivery": null,
          "quoteIds": [
            "tx-q10",
            "tx-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "tx-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The first anniversary of the last day a claimant may file the lien affidavit under Section 53.052"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q12"
          ]
        }
      ],
      "residential": [
        {
          "text": "To fix a lien on a homestead, the person who is to furnish material or perform labor and the owner must execute a written contract.",
          "quoteIds": [
            "tx-q16"
          ]
        },
        {
          "text": "Before the owner executes a residential construction contract, the original contractor must deliver a disclosure statement to the owner.",
          "quoteIds": [
            "tx-q17"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "If an owner's affidavit of completion is filed after the 10th day after completion, the date it is filed is the date of completion for the purposes of Subchapter E, on funds the owner must reserve, except as to a person to whom the owner did not send a copy as the section requires.",
          "quoteIds": [
            "tx-q18"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "A residential construction project is a project for the construction or repair of a new or existing residence, including improvements appurtenant to it, under a contract between the owner and a contractor to construct or repair the owner's residence. A residence is the real property and improvements for a single-family house, duplex, triplex or quadruplex, or a condominium or cooperative unit, owned by one or more adults and used or intended to be used as a dwelling by one of the owners.",
        "quoteIds": [
          "tx-q13",
          "tx-q14",
          "tx-q15"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "tx-q19",
            "tx-q20"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "tx-q21"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr., Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "tx-q22",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Confederate Heroes Day",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 1,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Texas Independence Day",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 3,
            "day": 2,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "San Jacinto Day",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 4,
            "day": 21,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Emancipation Day in Texas",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lyndon Baines Johnson Day",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 8,
            "day": 27,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Friday after Thanksgiving Day",
            "quoteId": "tx-q23",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 5,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": "The Friday after the fourth Thursday of November is always the fourth Friday."
          },
          {
            "name": "December 24",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 12,
            "day": 24,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "December 26",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 12,
            "day": 26,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "tx-q22",
          "tx-q23"
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered",
          "input": "Last labor or materials provided, or specially fabricated materials due, on",
          "hint": "The later of the day the claimant last provided labor or materials and the day the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered."
        },
        {
          "event": "completion",
          "clause": "the original contractor's work was completed, terminated, or abandoned",
          "input": "Original contractor's work completed, terminated, or abandoned on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the lien affidavit is filed",
          "input": "Lien affidavit filed on",
          "hint": "Leave empty if no lien affidavit has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "tx-0",
        "tx-1",
        "tx-2",
        "tx-3"
      ],
      "openQuestions": null
    }
  ]
}