Template · Project records

RFI Template (Word)

By Sami Chicha, EditorUpdated Checked against primary sources · not yet reviewed by a licensed professional
Quick answer

A free construction RFI template in Word, blank and set up for your letterhead. Page 1 holds the project, who it goes to and comes from, the spec section or drawing reference, the date an answer is needed, the question, a suggested solution, and Yes and No boxes for cost and schedule impact. Page 2 holds the attachments and the response. Page 3 is a filled-in example.

Preview of framingandfigures-rfi-template-v2.docx
Download
Download DOCX · 31.4 KB

framingandfigures-rfi-template-v2.docx. No email required. No macros.

© Harmony For Humanity LLC. Free for use in your business; not for resale. See our terms of use.

What it's for

A request for information, or RFI, is a written question to the architect, engineer or owner about the drawings and specs, answered in writing and dated. This RFI template for construction keeps both on one form: the question on page 1, the answer on page 2.

Use it when the documents leave something the crew can't build around: a missing dimension, two sheets that disagree, a detail that doesn't fit what's on site. A subcontractor can use it too, with the general contractor under TO.

This is the construction RFI, a question about the contract documents. It is not the procurement kind, where a buyer asks vendors about their products before a bid.

One RFI or a list of them? This form is for a single question. To track every RFI on the job, with dates sent and answered, days open and what is still outstanding, use the RFI log template beside it. Most jobs use both: the form goes out, and the log keeps the count. When the form goes out with drawings or other documents, the transmittal template is a cover sheet that lists what was sent, to whom and how.

An RFI is a question, not a change order or a claim. The form decides nothing about cost or schedule: its IMPACT boxes record whether you expect the answer to change either, so the person answering can address it. If the answer adds or changes work, price it on a change order. Whether an RFI also counts as notice of a change is for your contract to say, not the form. Our guide to change orders that get paid covers notice, pricing and billing a change.

What's inside

Three Letter-size pages, with our logo, a credit link and the page number in each footer: the blank form on pages 1 and 2, and a filled-in example on page 3. The pale yellow fields and lines are for typing, and nothing calculates. The form carries no terms and no signature line: the response records who answered it and when.

Page 1 is the request: your letterhead, with REQUEST FOR INFORMATION, RFI no. and Date on the right, then:

Page 2 starts with ATTACHMENTS, two lines. RESPONSE follows with six lines, then RESPONDED BY, DATE and a Yes and a No box for CHANGES COST OR TIME.

Page 3 is the example, under a band that reads EXAMPLE RFI (FOR REFERENCE; REMOVE BEFORE SENDING). It fills in every label from the first two pages, in the same order. Delete the page before you send a real RFI, or print only pages 1 and 2.

How to fill it in

  1. Type your details over the letterhead, replace YOUR LOGO with your logo, delete the example page, and save the result as your blank.
  2. Number each RFI in sequence for the job at RFI no., and enter the day you send it at Date.
  3. Fill in PROJECT, TO (the person who will answer) and FROM.
  4. At SPEC SECTION OR DRAWING REFERENCE, give the spec section and the sheet and detail the question is about.
  5. Fill in SUBMITTED BY, and at RESPONSE NEEDED BY, the date you need the answer by.
  6. Write the question under QUESTION. Each line is a table row that grows as you type, so a long question can make page 1 run over. Delete the empty lines under it to make room.
  7. Under SUGGESTED SOLUTION, write the fix you'd propose, if you have one.
  8. Under IMPACT, type an X over the Yes or the No box for COST IMPACT, and again for SCHEDULE IMPACT. The boxes are typed characters, not checkboxes you click.
  9. On page 2, list what you're sending with it under ATTACHMENTS, and send it.
  10. The person it goes to writes the answer under RESPONSE, fills in RESPONDED BY and DATE, and marks Yes or No for CHANGES COST OR TIME.

The worked example

Page 3 shows one RFI filled in from start to finish. The project, the people and the dimensions are made up.

FieldExample
RFI NO.14
DATE9/14/2026
PROJECTExample: two-story office addition
TOExample: project architect
FROMExample: general contractor
SPEC SECTION OR DRAWING REFERENCESheet A-201 (second floor plan) and sheet S-201, detail 4
SUBMITTED BYExample: project manager
RESPONSE NEEDED BY9/21/2026
QUESTIONSheet A-201 sets the second floor window heads along grid line C at 7 ft 0 in above the finished floor. Sheet S-201, detail 4, puts the bottom of the steel beam on the same grid line at 6 ft 10 in, which runs 2 in into the rough openings. Which governs: do the window heads drop, or does the beam move up?
SUGGESTED SOLUTIONKeep the beam where S-201 shows it and drop the window heads to 6 ft 8 in, using the next standard unit height from the same window line.
COST IMPACTYes
SCHEDULE IMPACTNo
ATTACHMENTS1. Marked-up A-201 and S-201, detail 4, showing the conflict at grid C. 2. Photo of the beam as set, taken 9/12/2026.
RESPONSEKeep the beam as shown on S-201. Drop the window heads along grid C to 6 ft 8 in and use the 6 ft 8 in unit from the same window line. A revised A-201 follows in the next drawing bulletin.
RESPONDED BYExample: project architect
DATE9/18/2026
CHANGES COST OR TIMEYes

It asks one question and names both sheets, so the architect doesn't have to hunt for the conflict. It proposes a fix the architect can accept or correct. It marks COST IMPACT Yes because a different window unit can cost more, and SCHEDULE IMPACT No because the steel is already set. The answer changes the work, so CHANGES COST OR TIME reads Yes, and the next step is a change order with this RFI attached.

Getting an answer you can build from

Ask one question per RFI. Each one then gets its own number, answer and date. Put two questions on one form, and one can come back answered while the other holds the RFI open.

Point to the spot: the reference on page 1, plus a marked-up sheet or a photo, listed under ATTACHMENTS, when a picture says it faster than a paragraph.

Propose a fix when you have one. It gives the person answering something to accept or correct.

Set the response date from the schedule. Work back from the day the affected work starts, less the time you need to act on the answer: ordering material, getting a revised shop drawing, moving a crew.

Keep every RFI in one list, such as our RFI log, and follow up on any that pass their response date. If the answer comes by phone or in a meeting, get it on the form before the crew acts on it.

When an answer changes the work, attach the answered RFI to the change order. It shows what was asked, what came back and when.

Frequently asked questions

Does it work in Google Docs or Pages?

Both open .docx files, and this one has no macros, form fields or content controls. Each app lays out Word files its own way, so check that ATTACHMENTS still starts page 2.

Can I add lines?

Yes. Each yellow line is a row in an ordinary Word table: click in one and insert rows above or below it. ATTACHMENTS always starts a new page, so rows added to page 1 can push the form onto three pages. Check the print preview.

Is there an Excel version?

Not of the form: an RFI is a page of prose, which reads and prints better in Word. The list of every RFI on a job is a spreadsheet, and our RFI log template is that sheet, in Excel.

Is it the AIA G716?

No. The layout and labels are our own, not a copy of AIA G716 or any other association's form. If your contract or the architect calls for a particular RFI form, use that one.

Is it legal advice?

No. The form doesn't decide whether an RFI counts as notice of a change, who has to answer it or how fast. Your contract governs those. If you want your terms reviewed, ask your attorney.